KOS AIRPORT "IPPOKRATIS"
- Construction of new terminal 24,000 m2
- Construction of new fire station
- Refurbishment and expansion of the sewage system
- 75% increase in the number of check-in counters (from 16 to 28)
- 125% increase in the number of security lanes (from 4 to 9)
- Full refurbishment of the runway
- Expansion and refurbishment of the aircraft parking area
- Construction of new guard house
- Installation of modern baggage handling system
- Redevelopment of existing forecourt and parking
Stakeholder engagement meetings
In an event held on November 29th 2017 in Kos, Fraport Greece presented to the local community, representatives of local authorities, local tourism stakeholders and local media its analytical construction plans for the development of Kos airport. In the context of taking over the management and operation of the 14 regional airports on April 11th, Fraport Greece held a round of nationwide stakeholder engagement events during which Fraport Greece presented its plans for all airports.
During the Q&A session the key issues that emerged regarding the Kos airport were the following:
• Construction of shadow areas outside the airport
• Odor issues at the toilets in arrival hall of the airport
• Development of baby changing facilities
• Refurbishment of the runway
• New information desk
• Establishment of regular meeting with stakeholders
• Garbage collection scheme
• Noise abatement measures.
Note: The technical specifications mentioned at the Stakeholder Engagement presentations, were valid on the day of the presentation and may have changed.